Issue |
La Houille Blanche
Number 7-8, Novembre 1977
|
|
---|---|---|
Page(s) | 575 - 582 | |
DOI | https://doi.org/10.1051/lhb/1977042 | |
Published online | 01 December 2009 |
Le problème des pompes-turbines vu par le maître d'oeuvre. Point de vue technique et économique
A Project Owner's view of the pump-turbine problem. Technical and economic aspects
1
Controleur Général à E.D.F., Direction de l'Equipement
2
Attaché à E.D.F., Direction de l'Equipement
3
Chargé de Mission à E.D.F., Direction de l'Equipement
4
Ingénieur à E.D.F., Direction de l'Equipement
Abstract
With the present considerable expansion of energy transfer by pumping, Electricité de France frequently has to compare several alternatives, among which especially ternary and reversible power units. TechnicaI and cost comparisons for these two alternatives are the subject of the first part of this report. In the second part of the report, problems peculiar to reversible pumps are discussed, which are mainly connected with pump start-up methods, electric circuitry and equipment, transient effects, and protective devices or systems. Unit output and specific speed data for the most important pump-turbines in the world are shown separately in terms of head on two graphs at the end of the report. The present specific speed limit appears to be denoted by a curve of the form 400 H - 0.375.
© Société Hydrotechnique de France, 1977