Issue |
La Houille Blanche
Number 2-3, Avril 1992
|
|
---|---|---|
Page(s) | 147 - 157 | |
DOI | https://doi.org/10.1051/lhb/1992012 | |
Published online | 01 October 2009 |
Evacuateurs fondés sur remblai
Spillways founded on earthfill
Coyne et Bellier, Bureau d'Ingénieurs Conseils, 5 rue d'Héliopolis, 75017 Paris, Tél. : (33.1) 40 54 68 69
Abstract
The specific technical problems raised by spillways founded on earthfill are coming from foundation (low shear strength, strain, seepage), and downstream stilling basin. The typical spillways experienced are armoured rockfill slopes, concrete spillway chute and armoured earthfill. Each type is illustrated, in the discharges possible range, by significant works. A new type can be imagined with a graded chute partially dissipating hydraulic energy and possibly limiting downstream stilling basin requirements. This new type should probably be usable in the same range of discharges as the above experienced types.
© Société Hydrotechnique de France, 1992
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.