La Houille Blanche, N°1 (Février 1999), pp. 35-43
Conditions techniques de raccordement au réseau public BT ou HTA des installations de production autonome d'énergie électrique
Technical conditions for connecting autonomous power stations to the French grid
Sogeco Hydroénergie
Abstract
Technical rules for connecting a private power station to the french grid with a voltage level up to 50 kV were defined. These rules are applicable for a new power station since mai 1995.
© Société Hydrotechnique de France, 1999
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.